Our Experience

 
lendlease.jpg

CCG3 was contracted by Delfin Lend Lease to supply and install a Fibre To The Home (FTTH) pit and pipe infrastructure at their Lakeside Estate in Pakenham. The network build consisted of the construction of all pit and pipe, external FDH cabinets, Communications Hut GPON distribution and lead ins to over 1000 lots.

 
opennetworks2.jpg

OPENetworks contracted CCG3 to roll out their first FTTH network in Victoria. The project consisted of the construction of an Optical Fibre network infrastructure providing a high speed data network to every home within the Lakeside Estate.

 
australand.jpg

CCG3 was contracted to supply, install and commission the OMNI directional radio system and wireless network system for Australand, including the installation of network and telephony extensions to remote locations.

cityofdarabin.png

CCG3 was contracted for the supply and installation of Community MESH Wireless System for Darebin city council, including the installation and commissioning of antennas and ticketing system currently in use.

 
Telstra.jpg

For the past 17 years CCG3 has been providing Telstra with specialised services for design, installation and commissioning of Telstra assets. CCG3 has been awarded an accreditation as an Industry Specialist Contractor and Consultant providing design, construction, consultancy and project management services for the relocation and installation of Telstra’s outside plant network.

Victrack.png

CCG3 was contracted to install the mains electrical feeder cables, electrolysis cables and communications cables over the 5 km tram line extension. The project consisted of co-coordinating the installation of the mains cables during peak traffic times and after hour cross-overs including road closures and tram operations.

 
MCG.jpg

CCG3 was engaged to manage and deploy the rolling changes and Telecommunications upgrade caused by the construction of the new Ponsford member pavilion and Northern stand at the MCG.  A complex and tightly scheduled project, CCG3 were responsible for the live cut-over of broadcast feeds for channels 7, 9 and 10. CCG3 had the full responsibility for this project’s success.

AVid.jpg

CCG3 has been contracted by Avid Property Group for the design, consulting, project management and auditing of the Bloomdale estate, Evans Park and Savannah Estate. CCG3 has provided these works for over 100 stages combined between the estates.

Grandprix.png

CCG3 was engaged by the AGPC to provide a bridged network solution with 100% site security which was achieved by the use of a wireless laser bridge that ran the IT infrastructure for the media centre, located in the pit building, and linking it back to the main administration office located on the other side of the circuit.

 